Skip to main content
All Study Cases
CloudDevOpsAzure

Cloud Migration

We executed a full-scale cloud migration of a production-grade system—from GitLab and DigitalOcean to Azure—rebuilding CI/CD, infrastructure, and service integrations for long-term scalability.

Cloud Migration

01 The Challenge

A production system running on DigitalOcean with GitLab CI had outgrown its infrastructure. Scaling was painful, costs were high, and the team lacked the observability and disaster recovery capabilities required for enterprise-level SLAs.

02 Our Solution

We planned and executed a zero-downtime migration to Azure: infrastructure-as-code with Terraform, containerized workloads on AKS, Azure DevOps pipelines replacing GitLab CI, Azure Monitor for observability, and geo-redundant storage for disaster recovery. The migration was done in phases to eliminate risk.

03 Tech Stack

AzureTerraformAKSAzure DevOpsDockerKubernetesAzure MonitorBicepHelm

04 Results

Infrastructure cost reduced by 30%. Deployment frequency increased from weekly to daily. Mean time to recovery (MTTR) improved from 4 hours to 15 minutes. The system now handles 3× the previous peak load with auto-scaling.

Ready to start your project?

Let's discuss what we can build together.

Book a 30-min call